https://etherscan.io/tx/0x40315cd1212ab36b0d50a825fa96c38d3c894db49b075bd67ef2ab6e4cd3910d
gm or gn.
The global LP locks have been extended to this coming weekend when there should be a window of opportunity for releasing the LP migration contract and completing the migration.
I apologize for these delays. Contract ownership and control is something that was never deferred to anyone on the team for security reasons. I have a number of unfortunate personal matters I have been dealing with and it is very challenging to delegate these tasks to anyone else.
The last thing I ever wanted was to be the single-point-of-failure blocking the success of the project and I assure you I am doing everything I can to get us past this point.
Thank you, again, for bearing with us through this trying stage.